制造方坯连铸机结晶器的时间—费用模糊规划
Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine
-
摘要: 提出了用于网络计划的时间-费用分析的模糊决策规划,计算结果表明,算法的优化结果使决策者获得了更充分的决策余地.该算法应用于武钢方坯连铸机结晶器制造过程中.Abstract: The paper presents the fuzzy plan of the time-cost analysis for network plan which on work in running and debugging on the computer.The calculating indicates that the optimization result of the algorithim makes the ampledecision room to the planner.