矿山建设项目可视化任务结构树

Visual Works Structure Tree of the Mine Construction Project

  • 摘要: 提出项目结构树概念,用项目结构树模型描述矿山建设项目任务的层次结构及其工作参数.应用数据结构理论和VisualBasic编程技术,研究项目结构树的生长算法,构造可视化项目结构树.以可视化项目结构树为基础,提出一种新的计划编制方法.

     

    Abstract: The project structure tree is defined to describe the works structure and the work parameters of mine construction project. By making use of data structure theory and programming technology of Visual Basic, the growing algorithm of the project structure tree is researched, and the visual tree is built up. A new plannig method is put forward on the basis of visual project tree.

     

/

返回文章
返回