专用炉混装模式下作业计划优化方法

Optimization method for operation planning of special furnace hot charge mode

  • 摘要: 针对钢铁企业热装作业中专用炉混装作业计划编制难题,建立了一体化作业计划优化模型,并提出基于优化与简单仿真相结合的多步骤优化方法进行模型求解.在给定工艺参数情况下,提出的算法可快速给出优化的、一体化专用炉混装作业计划及冷装、热装板坯的详细作业时刻.模型给出的优化结果满足工业实际需求,作业计划具有较强的可行性及可操作性.

     

    Abstract: An integrated operation planning optimization model for special furnace charge mode, which is a puzzle of integrated planning in iron and steel enterprises, was introduced. The model was solved by a multistep optimization method based on combining optimization and simple simulation. With given process parameters for simulation, an optimized and integrated operation planning and the operating time for hot and cold slabs can be presented rapidly by the optimization method. The result optimized by the model meets the actual demand, and the operation planning is feasible and operable.

     

/

返回文章
返回