Li Sujian, Chang Zhiming. Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J]. Chinese Journal of Engineering, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
Citation:
Li Sujian, Chang Zhiming. Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J]. Chinese Journal of Engineering, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
Li Sujian, Chang Zhiming. Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J]. Chinese Journal of Engineering, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
Citation:
Li Sujian, Chang Zhiming. Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J]. Chinese Journal of Engineering, 1999, 21(6): 535-538. DOI: 10.13374/j.issn1001-053x.1999.06.007
Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex
The problems of production logistics balance are researched according to typical iron and Steel production technological process. Models and methods for multiple stages production logistics balance are built, Which are facing the contracts delivery dates and weights. The models can help production management workers to draw up a balanced production plan.