WANG Gang, WANG Bin, WANG Bao, WANG Chuang, MU Yan-qing, WANG Bo-lin, LIU Qing, XIE Fei-ming, LI Hong-wei, NIE Xiao-wu, LU Xin-chun. Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle[J]. Chinese Journal of Engineering, 2013, 35(8): 1080-1092. DOI: 10.13374/j.issn1001-053x.2013.08.014
Citation: WANG Gang, WANG Bin, WANG Bao, WANG Chuang, MU Yan-qing, WANG Bo-lin, LIU Qing, XIE Fei-ming, LI Hong-wei, NIE Xiao-wu, LU Xin-chun. Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle[J]. Chinese Journal of Engineering, 2013, 35(8): 1080-1092. DOI: 10.13374/j.issn1001-053x.2013.08.014

Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle

  • Aiming at the steelmaking-continuous casting scheduling problem of a special steel plant, firstly, a multi-objective optimization scheduling model was developed, whose main evaluation indexes are furnace-caster matching degree, continuous casting heats, process waiting time, etc. Then the feasible range of product mix and production modes under different product mix conditions were analyzed by resolving the process flow structure and the operation cycle of steelmaking, refining, and continuous casting process. The scheduling problems under different production modes were solved by adjusting the operation cycle values of flexible processes on the basis of "furnace-caster matching" principle. Finally, the scheduling plans were calculated and compared with actual production data; the simulation results indicate the validity and superiority of the scheduling model and the solution strategy.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return